
Title | Strengthening bearings OV - 7 from the side of the semi-resistance 1, 1¹, 2, 2¹, 3, 3¹ between the farms 1 - 1¹, 2 - 3 and 2¹ - 3¹ of the divorce span of the palace bridge in St. Petersburg.Sections |
---|---|
Series | 1795-1861 |
Fonds | Plans and drawings of waterways and highways (collection) |
Display format |


